Mark Twain Reality
Ronald S. Pole
Refurnished Multi-Family Apartment units, work included Electrical, plumbing, interior and exterior painting, window replacements, flooring, ceramic tiling, dry walling, window coverings, and ongoing property maintenance. Alter building and room additions on properties throughout Los Angeles.
Paul R. Hammons, CPA. CFP. ESQ
Hodges and Hammons, CPA
Remodeling of home. Work included marble and ceramic tile installation, remodeling of kitchen and bathrooms, carpeting, custom drapes, vertical blinds, and bedroom ensemble. Exterior and interior painting and installation of wallpaper.
Andrea Kennon
Manager, Crystal Stairs, Inc
Work included custom lighting, hardwood floors, replacement of doors and windows, carpeting and area rugs, landscaping, window treatments, remodeling of kitchen, garage door, new custom driveway, and shutters.
Cathy Tate
Director, Crystal Stairs-Sage
Work included new plumbing, electrical, room addition, and painting, custom lighting, carpet, hardwood floors, and new master suite, gourmet kitchen, heating and cooling system, new garage, driveway, landscaping, and waterfall fountain.
Doris J. Wilson
Retired Educator
Remodeling of home. Work included windows replacement, garage door replacement, interior and exterior painting, carpeting, ceramic tile, roof and replacement of gutters, electrical upgrade, heater and air conditioning replacement, pool plaster, pool equipment, and room addition.
Professor Maryanne Desvignes
Los Angeles City College
Remodeling of home. Work included refinishing hardwood floors, Installation of vinyl flooring, new heating and Air Conditioning, glazing of Sinks, plumbing repairs, Shower doors, remodel kitchen and baths, installed fence and gates, screen replacement, window covering, upholstery, and electrical upgrades, and furnished all fixtures and appliances.
Carlene A. Davis
Director of Child Care, City of Los Angeles
Remodeling of Homes. Work included interior and exterior painting, electrical upgrading included installing additional outlets, installing new circuit breaker box, ceiling fans, light fixtures, and appliance installation. Installed dishwasher, refrigerator, stove, bath fixtures, and security system.
Linda Kuehlewind
Remodeling of home. Work included plumbing, electrical, painting, and refinishing and repair of deck, repair of ceramic tile, and lighting fixtures.
Shannon Howe
EVP Inglewood Chamber of Commerce
Complete home remodel, installed new wardrobe doors, bath fixtures, and ceramic tile patio, remove acoustic ceiling, interior painting, lighting, built new closet, new carpet, and plumbing repairs.
Reggie Spearman, Pastor
Faithful Central Bible Church
Tabernacle and Forum, Furnished approximately 1800 SY of carpet, 15,000 SF of vinyl tile, and 750 SF of ceramic tile. Work included custom design patterns of tile and carpet. Remodeled executive suite and conference room. Furnished and installed carpet in the administrative offices at the Forum.